Customization: | Available |
---|---|
Structure: | Overhanging |
Bench: | Double Stair |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Stair Stringer | 300*12mm in power coated carbon steel or stainless steel |
Stair Step | 38mm solid timber or laminated tempered glass. |
Standard Step Length | 800-1000mm. |
Standard Step Width | 225-300mm |
Wood Tread Option | 1#Europen Beach;2#Oak;3#Manchurian Ash;4#Thailand Oak |
Stair Railing | Post=Ø38*1.5mm round tube in sus304,sus316 or A3 steel |
Handrail | Ø50.8*1.35mm sus304,sus316 or A3 steel |
Riser Height | 150-200mm |
Our advantage is as below:
1. We are a real manufacturer, not trading company, with competitive price
2. Professional design team, will make proper suggestion for all project drawing to control or lessen purchase cost.
3. Offer oversea take meamsurement and installation service, solve all your skill problems.
4. With German processing machine to ensure polish quality
5. All of our products meet material test standard from ASTM,BS2026,CE and DIN/EN 12600
6. More than 7000m2 size factory, with professional manufacturer management.
We are a more than 15 years manufacture up to now, below is some projects we did before, share with you, any model you like
FAQ:
When do I start?
Contact us at the beginning of the design phase when you have the most options available and our expertise can be most helpful. We will meet your design requirements and bring value and dramatic design to your project. The longer you wait the more you limit your options or create unusual and costly framing changes.
How do I start?
Browse the website, make your choices: Type of Stair, style, wood and finishes. Once you know what you want, contact us for a site measurement. The details to your customized project will then be reviewed and finalized in a formal contract.
How do I order?
We will finalize the details and send a contract for you to sign. A shop drawing will follow for approval. A field technician will confirm field dimensions and the stairs go into production.
When does the stair arrive?
Once the staircase finished production and trial installation we will pack it and dliver to your jobsite, it takes around 45 days .