Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Onsite Installation, Ons |
Warranty: | 5 Years |
Still deciding? Get samples of US$ 0/Step
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ACE LED White Oak Teak Wood Treads Hidden Beam Floating Straight Staircase Stairs
Stair Data | Specification | Data | Specification |
Floor to floor height | Customized | Beam Thickness | 250-550mm |
Step Lenghth | 900-2000mm | Step Width | 250-350mm |
Step Height(Riser) | 150-200mm | Stairwell size | no less than 3500mm for curved stairs no less than 1300mm for spiral stairs |
Components | Dimensions | Material | Surface |
Stringer/Beam | length:Customized width:300mm thickness:12mm |
A3 steel; SS304/316 | Powder coated;Satin or mirror finish |
Stringer Support | ¢ 60*3.0mm round tube | A3 steel; SS304/316 | Powder coated;Satin or mirror finish |
Tread | length:Customized width:250-300mm thickness:30mm solid timber;25,52mm laminated tempered glass;30mm solid marble.(38mm solid wood/10+10mm/12+12mm laminated glass for spiral stair |
Timber, Glass, Marble | Painting,Frosted |
Tread Support | 50*50*4mm/38*38*4mm square tube | A3 steel; SS304/316 | Powder coated;Satin or mirror finish |
Balustrade | 12mm glass railing/stainless steel | tempered or laminated glass;A3 steel; SS304/316 | Clear,satin or mirror |
Handrail | 50.8mm handrail or slot handrail | A3 steel; SS304/316; solid timber; PVC handrail. |
satin or mirror |
Center Post | 104/108/114*4mm for spiral stair | A3 steel; SS304/316 | Powder coated;Satin or mirror finish |
When do I start?
Contact us at the beginning of the design phase when you have the most options available and our expertise can be most helpful. We will meet your design requirements and bring value and dramatic design to your project. The longer you wait the more you limit your options or create unusual and costly framing changes.
How do I start?
Browse the website, make your choices: Type of Stair, style, wood and finishes. Once you know what you want, contact us for a site measurement. The details to your customized project will then be reviewed and finalized in a formal contract.
How do I order?
We will finalize the details and send a contract for you to sign. A shop drawing will follow for approval. A field technician will confirm field dimensions and the stairs go into production.
When does the stair arrive?
Once the staircase finished production and trial installation we will pack it and dliver to your jobsite, it takes around 45 days .